Restructured Accelerated Power Development and Reforms Programme (R-APDRP)
|
Ministry of Power, Govt. of India, has launched the Restructured Accelerated PowerDevelopment and Reforms Programme (R-APDRP) in
|
the XI Five year Plan. Power FinanceCorporation Limited (PFC) has been designated by Ministry of Power, Govt. of Indiaas the Nodal
|
Agency for the programme. The programme spans from data acquisitionat distribution level till monitoring of results of steps taken to
|
provide an ITbackbone and strengthening of the Electricity Distribution system across the Countryunder the programme. The objective |
of the programme is reduction of AT&C lossesto 15% in project areas. |
The program is divided into 2 parts: Part-A and Part-B.
|
Part-A : Establishment of IT Infrastructurefor data, IT Application for energy accounting/auditing and IT based Consumer Services.
|
Part-B : Distribution system strengtheningand augmentation.
|
The Programme
|
Programme consists of Part-A covering Information Technology application in theelectricity distribution system and Part B covering the |
System strengthening, improvementand augmentation of distribution system capacity. Both parts entail planning ofmeasures to be |
taken under the programme, implementation of such measures to betaken and monitoring / evaluation of results / impact of the |
programme as a wholeand of its various components across the Country. The focus of the programme shallbe on actual, demonstrable |
performance in terms of loss reduction. Establishmentof reliable and automated systems for sustained collection of accurate base line |
data, and the adoption of Information Technology in the areas of energy accountingwill be essential for the success of the R-APDRP. |
- The Programme is proposed to be implemented on all India basis covering Towns andCities with a population of more than 30,000 (10,000 in case of Special CategoryStates) as per population data of 2001 Census.
|
- Projects under the scheme shall be taken up in Two Parts. Part-A shall include theprojects for establishment of baseline data and IT applications for energy accounting/auditing& IT based consumer service centers. Part-B shall include regular distributionstrengthening projects.
|
The activities to be covered under each part are as follows
|
Part–A : Preparation of Base-line Data System for the projectarea covering Consumer Indexing,GIS Mapping, Automatic Metering (ARM) |
on DistributionTransformers and Feeders,and Automatic Data Logging for all Distribution Transformers&Feeders and SCADA /DMS system |
It would include Asset Mapping of the entire distributionnetwork at and below the 11kV transformers and include the Distribution |
Transformers and Feeders,Low Tension lines,poles and other
distribution network equipment.It will also include adoption of IT applicat |
-ions for meter reading, billing & collection;energy
accounting & auditing;MIS, Redressal of consumer grievances and establishmentof
IT |
enabled consumer service centers etc.
|
|
The I.T. implementation agency (ITIA) would supply,install and
commission one integratedIT solution within the broad framework provid |
-ed in the SRS (System Requirement Specification)document.
Steering Committee of Ministry of Power under the guidance of Ministryof
|
Power has finalized a detailed SRS document which covers all
the components ofthe project including hardware, software, networking, |
GIS among others which shallhelp the utilities improve their performance.
|
R-APDRP Part-A programme is being implemented in 38 towns of NBPDCL. |
Towns covered under R-APDRP Part-A
|
**Towns not covered under R-APDRP Part-B Scheme.
|
Sl.no.
|
TOWN
|
Approved Project Cost (Rs. Crs.)
|
ELECTRIC SUPPLY CIRCLE
|
ELECTRIC SUPPLY AREA
|
1 |
Patna |
93.53 |
PESU(E), PESU(W) |
PESU Area, Patna |
2 |
Maner |
0.86 |
Patna |
Central Area, Patna |
3 |
Bakhtiarpur |
0.80 |
4 |
Barh |
1.21 |
5 |
Fatuha |
1.23 |
6 |
Masaurhi |
1.20 |
7 |
Mokama |
0.89 |
8 |
Arrah ** |
1.20 |
Bhojpur (Arrah) |
9 |
Buxar ** |
0.89 |
10 |
Dumroan |
0.85 |
11 |
Biharsharif ** |
4.94 |
Nalanda (Biharsharif) |
12 |
Hilsa |
0.91 |
13 |
Rajgir |
1.15 |
14 |
Gaya |
50.51 |
Gaya |
Magadh Area, Gaya |
15 |
Aurangabad |
2.24 |
16 |
Bodh Gaya |
1.11 |
17 |
Daudnagar |
0.77 |
18 |
Jahanabad |
1.94 |
19 |
Makhdumpur |
0.62 |
20 |
Nawada |
1.29 |
21 |
Sherghati |
1.01 |
22 |
Warsaliganj |
0.59 |
23 |
Sasaram |
2.21 |
Nalanda (Biharsharif) |
24 |
Bhabua |
1.17 |
25 |
Bikramaganj |
0.66 |
26 |
Dehri |
1.62 |
27 |
Bhagalpur |
6.43 |
Bhagalpur |
Bhagalpur Area, Bhagalpur |
28 |
Sultanganj |
0.92 |
29 |
Banka |
1.15 |
30 |
Naugachhia |
1.06 |
31 |
Munger |
2.69 |
Munger |
32 |
Sheikhpura |
1.16 |
33 |
Bar Bigha |
0.60 |
34 |
Jamalpur |
1.21 |
35 |
Lakhisarai |
1.53 |
36 |
Jha Jha |
0.97 |
37 |
Barhiya |
0.60 |
38 |
Jamui |
1.07 |
Total Cost |
197.50 |
|
|
|
Part–B: It covers renovation, modernization and strengtheningof 33/11 kV level Substations, Transformers, Re-conductoring of lines at |
11KV leveland below,Load Bifurcation,Feeder segregation, Load Balancing, Aerial BunchedConductoring in thickly populated areas, HVDS, |
installation of capacitor banks and mobile service
centers etc. In exceptional cases,where sub-transmission systemis weak,
strengthening |
at 33 kV levels may also be considered. |
|
R-APDRP Part-B programme is being implemented in 35 towns of NBPDCL. |
Towns covered under R-APDRP Part-B |
Sl.no.
|
TOWN
|
Approved Project Cost (Rs. Crs.)
|
ELECTRIC SUPPLY CIRCLE
|
ELECTRIC SUPPLY AREA
|
1 |
Maner |
0.95 |
Patna |
Central Area, Patna |
2 |
Bakhtiarpur |
5.70 |
3 |
Barh |
10.35 |
4 |
Fatuha |
12.97 |
5 |
Masaurhi |
1.89 |
6 |
Mokama |
4.24 |
7 |
Dumroan |
3.96 |
Bhojpur (Arrah) |
8 |
Hilsa |
1.86 |
Nalanda (Biharsharif) |
9 |
Rajgir |
2.50 |
10 |
Gaya |
0.95 |
Gaya |
Magadh Area, Gaya |
11 |
Aurangabad |
12.98 |
12 |
Bodh Gaya |
15.89 |
13 |
Daudnagar |
1.83 |
14 |
Jahanabad |
11.88 |
15 |
Makhdumpur |
4.93 |
16 |
Nawada |
5.75 |
17 |
Sherghati |
3.05 |
18 |
Warsaliganj |
2.15 |
19 |
Sasaram |
20.39 |
Rohtas (Sasaram) |
20 |
Bhabua |
9.59 |
21 |
Bikramaganj |
6.79 |
22 |
Dehri |
18.66 |
23 |
Bhagalpur |
55.71 |
Bhagalpur |
Bhagalpur Area, Bhagalpur |
24 |
Sultanganj |
3.37 |
25 |
Banka |
4.66 |
26 |
Naugachhia |
4.33 |
27 |
Munger |
23.51 |
Munger |
28 |
Sheikhpura |
6.07 |
29 |
Bar Bigha |
5.71 |
30 |
Jamalpur |
10.54 |
31 |
Lakhisarai |
9.08 |
32 |
Jha Jha |
3.13 |
33 |
Barhiya |
4.60 |
34 |
Jamui |
7.46 |
35 |
Patna |
506.14 |
PESU(E), PESU(W) |
PESU Area, Patna |
Total |
868.02 |
|
|
R-APDRP, PART-A, SCADA/DMS Project:
|
The Part-A of R-APDRP also envisages installation of SCADA/DMS projects in the townwhich have population of 4(Four) Lakhs and above |
as per census of 2001 and
energyconsumption of 350 MU and above. |
The SCADA/DMS System will provide Real time monitoring & control, loss minimization/loadbalancing and considerable improvement in for |
voltage/VAR profiles. It would also facilitateproper handling
of loads while load shedding & restoration, efficient planning ofnetwork for |
future growth by using proven power system planning tools. All
softwareapplications & RTUs/FRTUs including system sizing requirements |
the same shallbe considered in the SCADA/DMS system within the
broad framework provided in theMTS (Model Technical Specification) |
document. |
Only one town Patna is eligible for implementation of SCADA/DMS projects under Part-Aof R-APDRP. SCADA/DMS Project DPR of Patna |
has been approved by Steering Committeeof MoP for a project
cost of Rs. 34.36 Crores. Govt. of India approved Rs. 22.02Crores as |
loan. Balance fund of Rs. 12.34 Crores by Govt. of Bihar as loan.
|
|